In connection with the implementation of construction activities under the project "Increasing the capacity of the Danube Bridge Vidin-Calafat Border Crossing (entrance and exit) by installing an additional roof structure", in the period from March 20 to April 20, 2023, the movement of motor vehicles will be limited and stopped in stages and hourly on routes 5 and 6 at the entrance to Bulgaria/exit to Romania at the Danube Bridge Vidin-Calafat Border Crossing. The section will be signaled with the necessary traffic signals. "Danube Bridge Vidin-Calafat" AD calls on drivers to comply with the temporary traffic organization and to plan their trips according to possible delays.
The latest information about shipping services and our promotions